Tuesday 17 April 2007

MOL IST

MOL(Maintence On_Line)
IST(Integration and System Test)
1.GSR MOL IST Project Scope:
MOL IST is responsible for verifying the fixes of the SRs merged into each software release and make sure it don’t impact the existing system functionality. Different sized regression suites are used on a given release depending upon a number of
factors, including the type of release (Service Pack, QuickFix, etc.), scope of the changes, and amount of time available. MOL IST includes:
• SITG test
• Performance test
• Voice quality test
• Upgrade/Rollback and Compatibility
• Large configure test
2.MOL IST Objectives
The key MOL IST project objectives include at a minimum:
• Verify SRs have been fixed completely
• Verify the fixes don’t impact existing system functionalities
• Conduct MOL SPR regression test to ensure system functionalities
• Conduct small feature test dropped into the SPR
3.Roles & Responsibilities
3.1 Release Manager
• Release Manager has completely release/project responsibility for driving the Integration and System Test teams to meet all their deliverables and prime contact to the program manager of the project for Integration and System Test.
• Control the schedule and evaluate the work effort to meet all the deliverables
• Communication with other MOL management team member about load test issue and other thing.
• Summary the test result and collect the data to improve the MOL test
3.2 Team Leader
• Team leader lead the team from test execution perspective.
• Assign the work and SR list when the load is scheduled
• Distribute resources and equipment in the team coordinate the equipment between the different teams
• Control the test program and collect the test result to analyze it from technical perspective.
3.3 Release Technical Leader
• Team technical leader that has complete release/project responsibility for delivery of the test deliverables for the whole project and for meeting the test preparation and execution schedule from technical level.
• Preparation and execution on load test plan and test method.
• Trouble-shooting in technical field
• Communicate with customer profiling owner to get useful customer data for test coverage and toimprove test quality.
• Make sure feature test smoothly handover to MOL test, including test equipments/tools are ready before MOL testing, features technical training to MOL engineers, and initial the MOL test strategy.
• New test cases review/inspection when MOL engineers design new test cases against SRs or DCA action.
• Apply DCA trend analysis result into MOL test strategy and test improvement
• Audit MOL testing, so as to follow the correct process and high test quality.
3.4 System Tester
System testers in MOL IST team are responsible for the setup of test equipments, and the execution of MOL SPR test per test plan. Create new test cases if no specific case for SRs. Investigate problems with developer, and raise the SRs if necessary. Fill the TMS with the test results and comments. Put the logs to specific directories.